Getting power on site before the house goes up
Building on a rural block usually means you need power long before the house is finished. Tools need running, trades need to work, and the build needs to keep moving.
On this job, the customer had put up a shed first. Our job was the preliminary works: get a reliable off-grid system running in the shed so they can power the build and progress from there. In the video below, Jason from Off Grid WA walks you through the install on the day.
The system: Sigenergy now, Victron later
We started this property with a Sigenergy system sized to carry the shed and the build:
- 12 kW inverter
- Six 9 kWh batteries, giving 54 kWh of storage in a compact stack
- Solar panels mounted on the shed roof
The battery stack and inverter sit just inside the shed doorway, close to the switchboard.
This is a starting point, not the final system. Once construction starts and we have a clearer picture of the household’s real loads, we can add a Victron system and pair the two together. That way the owners aren’t paying for capacity they may not need, and the system can grow with the property.
Safety first, then straight rails
Before anyone steps onto the roof, the crew sets up harnesses and ropes. Working at height is part of every solar job, and it’s never rushed.
The install day was windy, with cloud cover rolling in. It was overcast but not raining, so it was still a good day to be installing on the shed’s black roof. Still, in that wind the team took their time and worked through it carefully, even if that meant coming back the next day to finish.
For mounting, we use Clenergy feet and rail. Most of our racking is black so it blends in with the all-black panels for a clean finish.
Getting the rails dead straight matters to us. The crew runs a string line along each row before screwing everything down, so the panels sit flat and even. Nothing looks worse than a wavy row of panels on a roof that’s otherwise straight.
A tidy inverter and battery wall
While the crew worked on the roof, the inverter and battery setup went in inside the shed. The equipment is mounted on a backing of form ply boards finished with cement sheeting. That wall holds the battery stack, the inverter and the switchboard in one organised spot.
Cables run up through the top and across the roof space, with ducting around them. It keeps the install neat, protected and looking like part of the building rather than an industrial plant room.
Why start with a staged system
If you’re building on an off-grid block, you don’t have to design your whole home system on day one. Starting with a solid shed system gets the build powered now. Expanding later, once the house loads are known, means the final system is sized to how you actually live.
At Off Grid WA, we’re electricians, not a sales company. We plan each system around the property, install it with care, and come back to build it up when you’re ready.
Building on a rural block and need power for the shed or the build? Contact Off Grid WA to talk through your plans, and watch the full video on YouTube.